Osiedle "Małe Ozorzyce" - domy jednorodzinne pod Wrocławiem

BUILDINGS ON THE RIGHT

(view from the access road)
building A1 plot 500m2 PLN 479,000
building A2 plot 536m2 sold
building A3 plot 535m2 PLN 499,000
building A4 plot 573m2 PLN 499,000

BUILDINGS ON THE LEFT
(view from the access road)

building B1 plot 580m2 PLN 539,000
building B2 plot 572m2 sold
building B3 plot 585m2 sold
building B4 plot 625m2 reservation

b01-en

b02-en

b03-en

b04-en

Completion standards

 

POSITION:

TECHNICAL DESCRIPTION

FOUNDATION
strip foundations reinforced concrete
foundation walls concrete blocks on mortar
floor on the ground concrete paving unit 15 cm, heating 10 cm Styrofoam
Ceilings system teriva 24 cm
exterior walls porotherm ceramic brick 24 cm
external walls' completion ceresit plaster coating, elevation board
external walls' heating Styrofoam - 12 cm
INTERIOR WALLS  
Partition porotherm ceramic brick 12 cm
internal walls' completion Lack
attic ceiling wooden collar beam
Stairs Poured
roof construction impregnated wooden collar beam rafter framing
roof coating Roben ceramic tile
window frame-woodwork PCV 5 chamber REHAU class A window pane 1.0
external windowsill ceramic drain oil collectors
front door anti-burglary wooden with glazing
internal doors Lack
garage gate segmental, electric drive, remotely controlled
INSTALLATIONS  
external:  
Electric 230 V, 400 V connection supplied to the building finished with a board – a feeder cable from a cable joint to the building, without a counter
telephone and entry phone prepared for installation in the building
Sewer supplied to the building
sewage tank holding tank external "cesspool" of 10 m3
Water connection supplied to the building from water-pipe network
Internal:  
Electric Lack
Sewer PVC supplies distributed to plumb-lines
Central heating and hot tap water Lack
tap water connection in the building
telephone installation Lack
chimney installation built-up brick chimney
TV installation Lack
Internal road built-up  
housing estate pipeline municipal pipeline network
rain sewage rainwater tank in the internal road collecting rain waters from the roadway and pavements through street outlets
CONNECTIONS    
Electric 230 V, 400 V connection, a feeder cable from a cable joint to the building, without a counter
Water from the housing estate pipeline network to the building, without a counter
Sewer 10 m3 holding tank, to the building
gas or other to be established by the Buyer
lighting protection system Yes
PLOT'S LAND UTILISATION    
pavement, drives concrete paving brick
terrain's fencing clinker posts from the front, entry gate, entry wicket, net fencing from the garden and neighbouring plots side
Terrace Poured
internal access road concrete paving brick
footpaths – pavements concrete paving brick 
green belt  in compliance with the project 

Contact

www.jcdevelopment.pl
mob. +48 509 431 300
mob. +48 605 984 016

sylwester.jasinski@jcdevelopment.pl
krzysztof.czyrski@jcdevelopment.pl